路缘石滑模机现场操作仅需4—5人
路缘石滑模机现场操作仅需4—5人,一次成型后,路缘石极少需要人工修补。每天可滑模成型路缘石约1000—1500米。
Only 4-5 people are needed for the operation of the curb slip form machine on site. After forming once, there is very little need for manual repair of the curb. Every day, it can form kerbs of about 1000-1500 meters.
传统路缘石预制工艺大致需要以下几道工序:购买大量路缘石模具——找场地大量预制路缘石——从预制场地装运路缘石到施工现场——现场卸车、安装、沟缝。过程中还会存在磕碰损坏路缘石。每天的安装效率仅约为500-600米。
The traditional kerb prefabrication process generally requires the following processes: purchase a large number of kerb Molds - find a large number of prefabricated kerbs in the site - ship the kerbs from the prefabrication site to the construction site - unloading, installation and groove joints on the site. There will also be bumps and damage to the kerbs. The daily installation efficiency is only about 500-600m.
路缘石滑模机生产打破原操作模式,就地生产,避免了预制过程的材料浪费,以及运输及现场安装过程中的损耗,可节约原材料约30%。以生产1m³混凝土的路缘石计算,路缘石滑模机生产比传统预制工艺具有省人工,省材料,省时间等显著优点,节省成本造价约25%—35%。
The production of curb slip form machine breaks the original operation mode and produces on site, avoiding the waste of materials in the prefabrication process and the loss in the transportation and field installation process, which can save about 30% of raw materials. Based on the calculation of the kerb for the production of 1 m3 concrete, the production of the kerb slip form machine has the advantages of labor saving, material saving and time saving compared with the traditional prefabrication process, and the cost saving is about 25% - 35%